Lafayette Primary

Mohawk Industrial 115kV, Elberton Primary 115kV, Possum Branch–Roopville 230kV

Pierce Powerline completed several major transmission projects to strengthen power systems in Georgia. At Lafayette Primary, we re-routed existing lines to new concrete poles and installed a new conductor to feed a substation. The Bio–Elberton Primary project rebuilt 7.8 miles of line, replacing old structures with concrete poles, reconductoring, and carefully relocating an active osprey nest with specialists while also removing OPGW from an energized line. At Possum Branch–Roopville, we installed fiber and conductor on a 230kV tie line and set three 130-foot poles. These projects highlight our ability to handle complex rebuilds safely and effectively.

  • Re-routing existing lines to new concrete poles
  • Installing a new conductor to support substations and tie lines
  • Rebuilding and upgrading transmission lines, replacing outdated wooden and lattice structures with concrete poles
  • Reconductoring with higher-capacity wire for improved reliability
  • Installing fiber optic cable for system communications
  • Setting large transmission structures, including 130-foot poles
  • Performing specialized environmental work, including the relocation of an active osprey nest with experts
  • Safely removing OPGW over energized transmission lines